Articles

Why is my screed crumbling?

Why is my screed crumbling?

If the screed is crumbling away, isn’t the right colour and has lots of broken patches then it’s probably not hard enough. If the problem is restricted to certain areas then it’s possible to cut out and replace the affected spots. Alternatively specialist resins or cementitious overlays can repair the damaged screed.

Is cracked screed a problem?

If the substrate is not sound, dry, contaminated, stable, insulation is rocking or you have gapping, there will be issues with the screed. So, the screed may dry out, you may end up with dusty surfaces. In extreme cases, you may experience some cracking because of weakness. It could be poor mixing practise on site.

Can you polish anhydrite screed?

This is to say, grinding the surface is unproductive and we are unable to polish it with our diamond tools as we would with a concrete slab. Screed floors can be transformed into polished flooring with the application of a concrete overlay or microcement.

How do I stop my screed from cracking?

Stress control joints should be put into the screed mixture to control cracking during the shrinking. These prevent random cracking and can be infilled once the screed has finished drying. Stress control joints can also be used to avoid cracks from the concrete substrate moving.

Why does screed fail?

Potential floor failures can occur if the screed is applied incorrectly and it ranges from cracks in the floor, to uneven and weak layers. At times, screed failure is also caused due to errors when laying underfloor heating (UFH), which is a popular accomplice for screed applications.

Can I screed over old screed?

Yes you can. The main reason to use concrete screed is to pour over a pre existing concrete floor / slab / sub base to level it out and leave a smooth finish.

Can you tile straight on to screed?

While adhesive manufacturers say you can tile straight onto new concrete or screed, we would strongly recommend the use of a primer to ensure there is a good “key” for the adhesive to take to. Eventually, this can lead to delamination where the tiles simply peel up!

How do you seal a dusty floor screed?

PVA Glue. Polyvinyl acetate, commonly known as PVA, can be used as a concrete sealer to protect your concrete garage floor from disintegrating. After thoroughly cleaning the concrete, you apply PVA sealer with a paintbrush and after drying, it will leave a clean, not dusty, floor.

What is the difference between concrete and screed?

What is the difference between screed and concrete? The difference between concrete and screed lies in their function: concrete is used for strength, whereas screed is used to finish floors as a top layer.

How do you fix a broken screed?

A screed repair needs to add something to the screed. With an open crack you would pour a low viscosity, two-part resin into the crack. If the crack is fairly wide and you can fill the crack first with kiln dried sand to bulk out the gap, before pouring in the resin.

How do you strengthen screed?

They can add Polypropylene Fibres, like ADFIL Durus to the concrete mix to reinforce it. You can add bags of fibres direct to mixer at the sit,prior to pouring or at the mixing plant. Can also be added to screed for same purpose, it replaces the mesh.

When does anhydrite screed start to go down?

On a job that’s had anhydrite screed pumped in, using a Wolff gm200 moisture meter readings in parts are 99.9% screeds been down since February. At its deepest it’s 150mm, what I’m stuck with is the builders trying to push on with the job. The flooring that’s going down is polyflor safety flooring it’s being glued down.

What causes a tile to fail on anhydrite?

Another common cause of failure when tiling onto anhydrite screeds is Ettringite formation. This occurs when the cement in a tile adhesive reacts with the gypsum in the anhydrite screed, forming mineral crystals at the interface which can cause debonding.

How long does it take for anhydrite cement to dry?

This means a typical anhydrite screed dries in about 49 days. Compare this to an OPC (Ordinary Portland Cement) screed which is dry in around 21 days, or even BAL QUICKSET CEMENT which dries within 4 – 48 hours, then you see where issues may occur.

What should the relative humidity of anhydrite screeds be?

Because anhydrite screeds have a higher moisture content and dry through a chemical reaction followed by evaporation which drastically increases the time it takes for the screed to reach no more than 75% relative humidity (r/H %) or 0.5 Water by Weight (w/w) as required by British Standards.