Other

What does ARTC stand for?

What does ARTC stand for?

Australian Rail Track Corporation
As Australian Rail Track Corporation (ARTC) we’re proud to be a vital part of the transport supply chain and the economic development of Australia.

What is a rail protection officer?

A Protection Officer (PO) is a person who is qualified to implement varying levels of safeworking worksite protection for activities being undertaken in the rail corridor by rail industry workers in the Transport for New South Wales/Sydney Trains Network.

How do I track a freight train?

Write down the time that the freight train passes by a track. This will be your starting point to track a freight train’s schedule. Figure out which direction the train is going via sun’s position in the sky, pocket compass or car satellite system. Locate the name of the freight train company on numerous cars.

What does a train network controller do?

Train Controllers are responsible for the safe direction of all train movements, whilst providing the highest possible standard of “On Time” running for the passengers. A key component of the role is the ability to remain alert and apply multiple contingency plans at the same time when required.

What are the responsibilities of the ARTC network?

This document details the key organisational responsibilities required to facilitate this integrated strategy. The following procedures are applicable to incident management on the ARTC Network.

Who is the business development director of ARTC?

Dr Wong Chow Cher is currently the Business Development Director in the Advanced Remanufacturing and Technology Centre (ARTC), of the Agency for Science, Technology and Research (A*STAR).

What is the purpose of Project Management in ARTC?

The planning, monitoring and control of all aspects of a project and the motivation of all those involved in it to achieve the project objectives on time and to the specified cost, quality and performance while acknowledging the constraints on project execution.

What should be included in an ARTC procedure?

This procedure and associated work instructions outline what is expected of those involved in ARTC project management at each stage of a project, and includes the actions required for the initiation, development, implementation, monitoring and closure of an ARTC project. This provides a consistent approach with respect to: