A bill of material (BOM) describes the different components that together create a product. For example- A computer is a product. Sales Order BOM (T-code-CS61) -Sales Order BOM is used for make-to-order production of products according to the requirements of customers.

What does BOM mean in sales?

bill of materials
A bill of materials (BOM) is a centralized source of information containing a list of items used to manufacture a product and the instructions on how to do so. Often shown in a hierarchical way, a bill of materials (BOM) lists the finished product at the top, down to individual components and materials.

How many types of BOM are there in SAP?

Depending on your production process needs, you can create 4 types of BoMs in SAP Business One.

What is BOM usage in SAP?

The standard SAP system allows you to maintain individual BOMs for any area of your company. These BOMs are maintained independently of each other and are assigned different internal BOM numbers. In this way, each area is only dealing with the specific data it requires.

What are the different types of BOMs in SAP?

The 4 Bill of Material (BOM) types in SAP Business ONE. 1 Production Bill of Material. For all Materials Requirements Planning (MRP) runs and standard production orders, a Production BOM is required. The 2 Sales Bill of Material. 3 Assembly Bill of Material. 4 Template Bill of Material.

How to create a sales order BOM in SAP?

Alternatively, you can use the transaction CS61 to create a order BOM. Enter the sales order number, the order item, the material number and the BOM usage. If you want to use a material BOM, or an existing order BOM to copy from, go to step 4.

How to use sales Bom in business scenarios?

But if customer will get 1 quantity of material B and 1 quantity of material C on buying 1 quantity of material A then we can get this done by using Sales BOM.The settings for main item and sub item will be as follows. I am assuming that you want to cumulate cost prices of sub items in main item at the time of billing.

What is a production Bill of material in SAP?

The components for Sales BOMs and Assembly BOMs must be sales items. The Components Management window allows mass changes in multiple existing bills of material simultaneously. And replace bill of material components. A production bill of material is a list of items and possibly resources that are consumed in the production process.